AI-native Manufacturing OS. Replaces fragmented ERP / MES / WMS silos with one platform spanning Plan → Buy/Source → Assemble → Move. Live at NeoLync Tirupati · manufacturing Jio Air Fiber Wi-Fi devices. 100% on-premise · 50+ operators on platform.
Forge organises the factory across four stages on a single fabric. Every stage on the same data spine · every action traceable from raw material to dispatched carton. Outcome metrics per the Fynd MOS deck.
NPI planning · BOM & version control · routing & engineering · IIoT integration · inventory, label, workforce, work order planning · compliance.
Vendor & customer traceability · Procure-to-Pay · material traceability · WMS · kitting · IQC · compliance management.
Replenishment & requisition · kitting tracking · station-level inventory · MES + QA · repair & scrap · failure record · workforce tracking.
Scan → Pack · WIP & FG tracking · warehousing internal & shipping · ASN + e-invoice generation · customer approval & dispatch.
A unified data backbone connects every module through a central API and AI orchestration layer. No silos, no manual reconciliation between systems.
Vendor management · PO · GRN · approvals.
FIFO · Handling Unit (HU) tracking · expiry alerts · cold storage monitoring.
SMT · SPI · AOI · Reflow · QA — fully integrated with route logic.
Multi-rev BOM · component substitution · ECO traceability · approvals.
Workforce productivity · access control · role-based dashboards.
Order / SLA visibility.
Technical integration of tools & equipment · HRMS · GreyHR · SAP · Infor.
Central intelligence layer connecting all modules.
Forge is deployed at NeoLync's Tirupati facility supporting Jio Air Fiber Wi-Fi device manufacturing. Current production run-rate ~1,000 units. Platform handles peaks of 3,000 TPS during high-volume runs. 50+ operators and 25 line managers are on Forge today. Deployment is 100% on-premise — high reliability, complete data control, low-latency operations. End-to-end traceability across the entire production process. Pilot rollout in progress; plan is to extend Forge across all production sites and product lines within the plant.
Go-live validation runs against a 15-category checklist (v2.0 · 07-Apr-2026). Phase 1 covers planning & traceability, quality & repair, scan-pack, ASN, and predictive maintenance. Each item carries a Fynd development status, a NeoLync site readiness status, a DRI / reviewer pair, and a target date.
Six surfaces from the Forge MES live at NeoLync Tirupati. Real product, real serial numbers, real BOMs · captured 30-Apr-2026.
Plant Administrator landing · Plant Health Score · OEE · FPY · Active Work Orders · 222/222 stations running · 136 total users.
Work order #1023044 · LUX MICRON DDR JIDU6601 · 10 PCS · 30 stages · 44 steps · 270 logs · real serial numbers. Client: JIO. Pack-QC inspection step detail expanded.
Per-unit identifier binding · REGNO · MAC · DDR / ACS / BTRY / FCBA / MODEL_NAME · partition IDs. BOM Progress shows component-by-component pull (PALLET CARD TRAY, PALLET PE BAG, PALLET CRAFT ANGLE, etc.).
43 samples · 24 passed · 55.8% pass rate · TAT 4h 46m. Breakdown across IQC types (ORT, Incoming QC, Outgoing QC, Pre-Delivery, Aging, In-Process QC). 7-day inspections trend.
| # | Category | Scope |
|---|---|---|
| 01 | Product Master & SKU configuration | FG / SFG SKUs · attributes · images · customer mapping |
| 02 | Material Master & Inventory | Raw material masters · UoM · storage classification |
| 03 | Bill of Materials (BOM) | Multi-rev BOM · component substitution · ECO traceability |
| 04 | Routing, Stations & Work Instructions | Site → Line → Station hierarchy · routing & operations · digital work instructions |
| 05 | Production Line Infrastructure & Machine Readiness | Machine & equipment configuration · network & internet connectivity |
| 06 | Forge Edge Client & Automation Tools | Edge install · machine log reading · data sync reliability · automation tools |
| 07 | Serialisation, Identifiers & Unit-Level Traceability | SN · RSN · IMEI · MAC ID · PSN binding rules |
| 08 | Assembly, Accessories & Packing Configuration | Assembly readiness · packing configuration in Forge |
| 09 | Shift Configuration & Production Scheduling | Shift planning · work order release · skill-based allocation |
| 10 | Testing, Quality & Inspection | Pre-Assembly / PCBA testing · Post-Assembly / FATP testing · QMS |
| 11 | Order Management, Invoicing & Documentation | Customer order book · invoicing · documentation |
| 12 | Shipping, ASN & Dispatch | Advance Shipping Notice · e-invoice · dispatch flow |
| 13 | Forge Dashboards, Analytics & KPI Reporting | Live OEE · FPY · downtime · throughput · SLA dashboards |
| 14 | User Access, RBAC & Operator Training | RBAC · role-based UI · operator training |
| 15 | Go-Live Validation, Dry Run & Hypercare | Dry run · go-live cutover · hypercare window |