(Procuro · IntelliMake · IntelliQC · IntelliPack)
The backbone of how goods move from suppliers to stores. PO → Make → QC → Pack → Ship. PO-to-Shipping cut from 55 → 30 days (45% faster).
Revolutionising apparel manufacturing. IntelliVerse IS the Manufacturing Execution System (MES) — a unified AI-native vendor OS that connects every stage of the factory.
- The challenges (before): scattered tools & manual reports · WhatsApp / email coordination · data duplication & loss. - Key benefits: Unified Vendor OS · Smarter Pre-Production · Seamless Daily Reporting · Proactive in Quality · Faster to Packing · End-to-End Traceability. - System modules: Pre-Production Order Summary · Daily Production Reporting (DPR) · Quality Audit Module · Full QC Visibility · IntelliPack Integration · Capacity Declaration · Integrations & Webhooks · AI Orchestration.
This is the backbone of how goods move from suppliers to stores. Suppliers use it to scan, pack and ship products and can access the mobile shipping app by scanning a QR code (no URLs to remember). Quality inspectors check goods at the factory and now catch problems at 10% completion instead of waiting until 70%, saving huge re-manufacturing costs. Sourcing teams manage purchase orders, new partners can be added through settings instead of needing custom engineering work. Operations teams get real-time system health monitoring, problems are diagnosed in minutes, not hours.
Adoption snapshot as of 15 Apr 2026. Data from IntelliMake adoption statistics and Q1 release notes. The 11.85 Cr garments figure is the cumulative volume processed through the IntelliVerse pipe.
Quality inspectors catch defects at 10% order completion (vs 70%), saving 2-3 weeks rework. Suppliers see one consolidated timeline per product per month (vs 3 separate timelines). Format heads can delay delivery dates and the system recalculates penalties automatically. New partners (AJIO, LivSmart, Fynd Create) added via configuration, not custom code. PO-to-Shipping cycle: 55 → 30 days (45% faster).